BIM application into Vinata Tower in Hanoi, Vietnam

The project devices into 3 packages:




Package 2: Pre-construction phase
Detail model 1 mock-up room (for design)
Model temporary system: scaffolding, mast crane, hoist…, quantity take off and purge employer’s schedule; integrate model of temporary system, structure model, site model, construction schedule in plan/ reality to model construction sequence from basement; update adjustment construction schedule (for construction activities)
Package 3: As-built modeling and quantity takeoff (don’t include as-built draw)
According to requirement of employer and particularity of project, ViBIM assists to Vinata use five BIM applications by the latest version appropriate software , including:

Purpose to apply BIM for project:

After each time of change, the control old and new error and update clashes report are automatic according to process.