Architectural, Structural, and MEP Modeling, BIM Coordination for a School

Project

Published by:
Datasheet
Company: Tesla Outsourcing
Location: Ahmedabad, India
Year of the project: 2016
Published: 08/09/2018
Description

1.Project Highpoints:

1.1 Project Objective

To create an Architectural, Structural, and MEP model LOD 300 for a School in USA

1.2 Client Summary

The client is a global engineering firm based in the USA and spread over multiple locations. With over four decades of presence and experience in working on diverse projects, the company is a well-known name in the US.

1.3 Project Summary

Tesla had to create Architectural, Structural, and MEPF models for a School in the USA. The total area to be modeled was 3,50,000 sq. ft. This was a renovation project wherein the client had provided us with the pdfs of the existing structure and CAD drawings for the new designs. These included Architectural plans, elevations and sections, Structural design drawings and MEPF design drawings. The architectural and structural models were first developed by Tesla based on the existing structure and new design changes. We had a team of 3 architects and structural engineers working on the model. Once this model was approved by the client, the MEPF components were modeled and interference check and coordination were carried out on Navisworks.

1.4 Project Deliverables

Final deliverables included coordinated Architectural, Structural, and MEP BIM model of LOD 300.

2.Challenges

·Routing pipes was a major challenge as the space for running the services was less. Tesla coordinated the model with minimum changes in the design after receiving the approval from the client.

·The turnaround time was very short. Tesla successfully completed the project within 90 business days.

3.Conclusion

Client appreciated the quality and the turnaround time in which we delivered the project.

Type of Work
  • Building
How was the BIM Experience in the project?
Reality Simulation: Does it help to get an idea of the final product?
100
5/5
Waste reduction, labor costs and deviations
100
5/5
Greater control of the construction process
100
5/5
Improves collaboration between agents
100
5/5
Conflict resolution and clash detection
100
5/5
Correction and error handling
100
5/5