Case Studies

Real stories from real BIM people

Architectural BIM Model for Religious Building in USA

Project

Published by:
Datasheet
Company: Tejjy Inc.
Location: Washington, D.C., United States
Published: 13/01/2021
Description

Tejjy Inc. created the Architectural BIM (Building Information Modeling) Model for MLC. Competent BIM Engineers of the architectural BIM service company in USA added value to the project with 3D BIM, reducing construction risk, decreasing change orders, optimizing construction schedule and improving design quality.

Facts about the Religious Building Project:

  • Company Name & Location - MLC

  • Project Vertical Served – Mosque (Religious Building)

  • Scope of BIM Work: Architectural modeling 

  • Number of People involved in the project – 2 Engineers

  • Total number of Building Involved -  1

  • Start Date of BIM – June 2019

  • End Date of BIM – June 2019

  • Software  Used -  Revit, Navisworks, AutoCAD

Scope of Work for the Project - Architectural BIM Modeling

Standard Process Considered for Project Execution - The client provided AutoCAD file and space planning of the mosque. Based on this, Tejjy Inc. architectural BIM modelers created the Revit model & 3D rendering images.

Project Challenges - Tejjy Inc. faced minor issues associated with the topography. It was challenging to obtain the topographic elevation labels of the surrounding areas.

BIM Solution Undertaken by Tejjy Inc. BIM Consultants: 

  • Tejjy Inc. BIM engineers sent different sections of the architectural project to the client. A contoured survey was provided to visualize the land accurately, defining the ground and boundaries.

  • Using 3D BIM Modeling, Tejjy Inc. resolved problems with staircase, where the stair was clashing with the slab.

How the technology usage helped to simplify the project workflow?

  • Tejjy Inc. BIM engineers provided the client a clash free 3D model  for BIM project execution. This reduced the overall confusion and accelerated the construction phase.

Value Addition through BIM Modeling

  • A digitized 3d BIM model, allowed a visual representation of what a building will look like and operate

  • Coordination is faster and easier for the project stakeholders 

  • BIM enabled architectural modeling facilitated design build process, improving project quality and accelerating construction workflow. 


Project Snaps

https://lh4.googleusercontent.com/4jg5iooU6Vyg3H8Zm1ya1TtCHD4UI_8_96kfA-HiqfURxQfY_Na0u1-qI6ilo44K9bnQMC6HECXo1w0-VFE3RHQ4bU_YoN7QfWHEqsZXfqDk2AMWZaUOhgy09cCVt5bsV6sIYkLnsJojlXgfeQ https://lh6.googleusercontent.com/qhMT3tOTNTOm3mDiE-mJV14TIxN8LNEEvpw27HKwfUPVNWSQtbDqw9zqsigs1iSk9UXCOhKXv8lvGgQIgUjApgZhmU3losg9Tj5UCYHpPKLX2PMbA33cSgX88y8XftUBD4wXDFx3K-FEzfmZew https://lh6.googleusercontent.com/rM1wBQHNEAva6QLl-3714ydahnuC8vfX99GR23eWKtjiygF6FyE_z5izmFjQz-_2htcn_Zu-qkN2ra2soiNztdw9Lnfsi5_gihGoU1TWnOlOmNEAX_jIti5cypCc0dWUwm8ptgCvFyckIqBkWg https://lh6.googleusercontent.com/M9j7HATDxMPpROpjR2mwjGKIU1fCRQ8LO4J7qnTTAaeL-nlJrtvIQm6Wa2eBZsxuf4b0BLmNWw7wCo7B4w0EreFEvSS5HBH87L6-XYHCka3P14p3Cvr_PrmMFVWoIwlzaJM-FaTanq0Qm1GNvw https://lh4.googleusercontent.com/3LsYCZlHld2sBrTbRDyvveZIG99ay4AUTJJJQ8tXeKFjgkzHiZ8s_rOoLleUpww1hIalMzplNGvrtq5lbwMsXJz_KkDx8zfgI2yDL9xdpLDMPbLqSf-G5C76OPK6A8fqAzIE3kMC4RyfI2sRzA


Type of Work
  • Building
How was the BIM Experience in the project?
Reality Simulation: Does it help to get an idea of the final product?
80
4/5
Waste reduction, labor costs and deviations
80
4/5
Greater control of the construction process
80
4/5
Improves collaboration between agents
80
4/5
Conflict resolution and clash detection
100
5/5
Correction and error handling
80
4/5
Stay updated with the latest news, events, job offers, software and much more. Sign up to our monthly Newsletter and enjoy the best of BIM for free

Thank you for subscribing to the Newsletter!