Technical Area | BIM Tips

The place to solve all your BIM doubts

profile_picture
Published: 25/10/2021

Tips for increasing the coordination in BIM

One of the principle objectives of BIM coordination is to arrive at more effective collaboration results by joining the efforts of various disciplines inside a specific construction project. Thusly, clash detection is a fundamental piece of 3D BIM coordination that can find issues between various plans and models to work out the most effective way of fixing them.

- Right model position is fundamental

- The significance of picking between BIM coordination tools such as Common Data Environments, Modeling tools, BIM coordination tools

- A common format for models

- Consolidating distinctive IFC models

- Ponder the extent of the coordination check

- Decide the really taking a look at rules

- Perform a model check

- Finding the right people to fix the collision check that you found

- Communicating with team members about fixing the clashes

- Dissect the consequences of Clash fixing and sort out your following stages

Source: https://www.linkedin.com/pulse/tips-increasing-coordination-bim-sandya-devarajan-/?trackingId=lqsiHUfISAy72d66tZDeWg%3D%3D

Stay updated with the latest news, events, job offers, software and much more. Sign up to our monthly Newsletter and enjoy the best of BIM for free

Thank you for subscribing to the Newsletter!