Case Studies
Real stories from real BIM people
Riyadh Metro (Lines 4, 5 and 6)
Other
Published by:
Datasheet
Company: FAST
Location: Riyadh, Saudi Arabia
Published: 15/01/2018
Description
Purpose of using BIM The contract is a Design & Build Lump Sum, in which BIM was used for part of the design carried out by CJV (Construction JV and MEP). BIM, among other things, was used for the following:Â Producing Combined...