Case Studies

Real stories from real BIM people

Steel detailing and miscellaneous metal detailing for a hotel project in USA

Project

Published by:
Datasheet
Company: Enphy
Location: Cabot, United States
Published: 20/06/2018
Description

Each Set of drawings had a specific deadline and we had to prioritize the work as per the bifurcated delivery schedule provided by the client.

Solution

The client provided structural & architectural drawings, scope of work with the bifurcated delivery schedule. Our team prepared complete erection & shop drawings, ABM (Advanced Bill of Materials), reports, KSS files, NC files, DXF files etc.image

Type of Work
  • Building
How was the BIM Experience in the project?
Reality Simulation: Does it help to get an idea of the final product?
100
5/5
Waste reduction, labor costs and deviations
100
5/5
Greater control of the construction process
100
5/5
Improves collaboration between agents
100
5/5
Conflict resolution and clash detection
100
5/5
Correction and error handling
80
4/5
Stay updated with the latest news, events, job offers, software and much more. Sign up to our monthly Newsletter and enjoy the best of BIM for free

Thank you for subscribing to the Newsletter!