Case Studies

Real stories from real BIM people

Scan to BIM project for Office Building in the USA

Project

Published by:
Datasheet
Description

Project Objective

ViBIM executed this Point Cloud to BIM project for a client in the USA. The project included the creation of as-built 3D BIM models of a 9-story office building of 320000 square meters (SQFT). The team modeled all architectural, structural, and MEP elements i.e. facade, ceiling, framing, duct, pipe, conduit above ½ inches. All models required with LOD 300.


The client provided us with point cloud data in the file format of .rcs / .rcp for all three buildings. Besides, the team also received construction drawings that helped the team create 3D models with the exact building elements.


The solution

The team implemented Revit modeling parallel to the process of scanned point cloud data. To assure that the input data had no errors, the team processed the quality checks of data before modeling, and used Naviswork to perform QA/QC. The created 3D models met the exact technical requirements of construction drawings.


The deliverables were the files of Architectural, Structural, MEP Revit models of LOD 300. 


image

image

For more information, please visit the website: https://vibims.com/project/scan-to-bim-project-for-office-building-in-usa?utm_source=bimcommunity&utm_medium=post

Type of Work
  • Building
Companies collaborating in the project
Actors
How was the BIM Experience in the project?
Reality Simulation: Does it help to get an idea of the final product?
60
3/5
Waste reduction, labor costs and deviations
80
4/5
Greater control of the construction process
80
4/5
Improves collaboration between agents
80
4/5
Conflict resolution and clash detection
80
4/5
Correction and error handling
80
4/5
Stay updated with the latest news, events, job offers, software and much more. Sign up to our monthly Newsletter and enjoy the best of BIM for free

Thank you for subscribing to the Newsletter!