Case Studies

Real stories from real BIM people

BIM During Remodeling of 100+ Year Old Hotel Project

Project

Published by:
Datasheet
Company: United-BIM
Location: East Hartford, United States
Year of the project: 2019
Description
  • About project

  • When you set to redesign a 100+ year old heritage hotel, you know it's going be a challenging task. This remodeling project demanded accurate mapping of the existing building, creating a demolition plan and drawings and then redesigning the new construction. Creating accurate As-built drawings required significant coordination between the cross-design models. The structure is a 5-story building with around 150 rooms into the new design. MEP coordination becomes a critical and important aspect of this project while remodeling any old structure.

PROJECT BRIEF
  • For the renovation of the existing design, at first, we went ahead with the creating the As-built drawing of the building. Existing design drawings and mapping of the building provided the insight to build them. Our BIM modeler recreated the error-free demolition plan from the existing building plan. This 3D model contains customized Revit families/joinery items, crucial ducting system, and HVAC installations. This project has gone through various design phases such as As-built model, demolition model, 3D modeling, MEP coordination and more.
Type of Work
  • Civil work
Companies collaborating in the project
How was the BIM Experience in the project?
Reality Simulation: Does it help to get an idea of the final product?
100
5/5
Waste reduction, labor costs and deviations
100
5/5
Greater control of the construction process
100
5/5
Improves collaboration between agents
100
5/5
Conflict resolution and clash detection
100
5/5
Correction and error handling
100
5/5
Stay updated with the latest news, events, job offers, software and much more. Sign up to our monthly Newsletter and enjoy the best of BIM for free

Thank you for subscribing to the Newsletter!